Battery Standby
Amp-hour capacity required to hold a system up for the standby period, with derating for age and temperature.
Planning estimates only. This calculator is not a substitute for engineered design or manufacturer specifications. Verify the final design against OEM documentation and the codes your authority having jurisdiction enforces.
The formula
Exactly what the calculator computes, in the order it computes it. Highlighted terms are your inputs.
// Ampere-hours consumed in each state standbyAh = standbyCurrent(A) × standbyHours alarmAh = alarmCurrent(A) × (alarmMinutes ÷ 60) calculatedLoad = standbyAh + alarmAh // Derating for age, temperature, and end-of-life capacity requiredAh = calculatedLoad × deratingFactor // Round UP to a standard capacity — never down battery = smallest standard size ≥ requiredAh 4.5 · 7 · 9 · 12 · 18 · 26 · 35 · 40 · 55 · 75 · 100 Ah // Recharge check, if a charger output is given rechargeHours ≈ installedAh × 1.2 ÷ chargerCurrent
What it assumes
Each of these is a way the number can be wrong for your job. Read them before you buy hardware.
- Constant current draw. Real loads vary — card reads, relay operations, and communications all cause momentary peaks. Sum the worst-case quiescent draw of every device, and include the panel's own consumption, which is routinely forgotten.
- Sealed lead-acid chemistry. The standard sizes and the derating convention assume SLA/VRLA batteries, which is what almost all ESS panels use. Lithium chemistries behave differently and have their own sizing rules.
- The derating factor is doing real work. A battery delivers its rated capacity when new, at 25 °C, at a slow discharge rate. It will not do so at four years old in an unheated closet in February. 1.20–1.25 is standard practice; use more in cold or hot environments, or where replacement intervals are long.
- Peukert's effect is not modelled. Lead-acid capacity falls as discharge rate rises. A 7 Ah battery rated at the 20-hour rate delivers noticeably less than 7 Ah when discharged over 4 hours. For short, heavy standby periods, treat the result as optimistic and derate harder.
- Check what your specification actually requires. Standby periods vary: many access control specifications call for 4 hours, NFPA 72 commonly requires 24 hours plus 5 minutes of alarm for fire alarm, and UL 2050 environments have their own requirements. This calculator does not know which applies to your job — enter the number your specification states.
- Recharge time is a rough estimate. The 1.2 multiplier accounts for charging inefficiency. Real recharge depends on the charger's algorithm and temperature compensation. Many standards impose a maximum recharge time (NFPA 72 requires 48 hours), so check the result against your specification.
- Avoid more than two parallel strings. Parallel batteries age unevenly, and a single weak cell will drag the bank down and mask the fault until it matters. Prefer a larger single battery, a larger cabinet, or distributing the load across additional power supplies.
- Voltage drop is a separate problem. As the battery discharges its terminal voltage falls, and the devices at the end of the longest run see the least of it. Re-run the voltage drop calculator at end-of-discharge voltage, not at float.
Questions people ask
- How many amp-hours do I need for 4 hours of standby?
- Multiply the total standby current in amps by 4, add any alarm load, then multiply by a derating factor of about 1.25 and round up to the next standard battery size.
More power and cabling tools
- PoE Budget Total switch power required by a device list, with cable loss and headroom against the switch you actually specified.
- Lock Power Budget Power supply size for an access control door set: locks, readers and sensors, the worst-case simultaneous unlock, and the battery standby that follows.
- Voltage Drop What voltage actually arrives at the device on a 12 or 24 VDC run, checked against its minimum operating voltage.
- Conduit Fill Fill percentage for a conductor list against the NEC limits, with the smallest trade size that passes.
Need it designed, installed or maintained?
We design and maintain these systems for federal facilities. Bring us the drawings.