The formula
Exactly what the calculator computes, in the order it computes it. Highlighted terms are your inputs.
// Cross-sectional area of each round cable cableArea = π × (outsideDiameter ÷ 2)² totalArea = Σ ( quantity × cableArea ) // Fill against the conduit internal area (NEC Chapter 9, Table 4) fill% = totalArea ÷ conduitInternalArea × 100 // Permitted fill (NEC Chapter 9, Table 1) 1 conductor → 53% 2 conductors → 31% 3 or more → 40% PASS when fill% ≤ limit // Spare capacity for additional cable spareArea = (conduitInternalArea × limit) − totalArea
What it assumes
Each of these is a way the number can be wrong for your job. Read them before you buy hardware.
- NEC Chapter 9 areas and limits. Internal areas follow Table 4 and the fill percentages follow Table 1. These tables are revised between editions — verify against the NEC edition your AHJ has adopted, and note that some jurisdictions amend them.
- The two-conductor 31% limit is easy to miss. It is lower than both the single-conductor and the three-or-more limit. It exists because two round cables pack poorly, not as an arbitrary rule.
- Round cables assumed. Area is calculated from a circular cross-section. Flat, oval, or irregular cable will not pack as the arithmetic suggests — use the manufacturer's stated cross-sectional area for anything non-round.
- Published cable ODs are nominal. Real diameters vary by manufacturer, jacket rating, and production lot. Plenum-rated cable is often a different diameter from riser-rated cable of the same type. Measure the cable you are actually pulling for anything close to the limit.
- Fill is not the only limit. A run that passes fill can still be unpullable. Bend count and radius, run length, pull tension, jam ratio, and lubrication all matter. NEC limits total bends to 360° between pull points, and long runs with multiple bends need derating well below the fill limit.
- Jam ratio is not checked. Three cables of similar diameter in a conduit whose inner diameter is 2.8–3.2 times the cable OD can jam regardless of fill percentage. This is a common failure on three-cable pulls.
- Nipples are exempt. Conduit nipples 24 inches or shorter between boxes are permitted 60% fill under NEC Chapter 9 Note 4. This calculator does not apply that exception.
- Derating and separation are separate questions. Fill says nothing about ampacity derating for current-carrying conductors, nor about required separation between power and communications cabling. Both may govern before fill does.
- Design below the limit. Filling to exactly 40% leaves nothing for the moves, adds, and changes that always come. Common practice targets 25–30% on new work so the next technician has somewhere to put a cable.
Questions people ask
- How many Cat6 cables fit in 3/4 inch EMT?
- At the NEC 40% limit for three or more cables, about four Cat6 UTP cables of 0.24 inch diameter. Most designers target 25 to 30% fill on new work so the conduit can take another cable later.
More power and cabling tools
- PoE Budget Total switch power required by a device list, with cable loss and headroom against the switch you actually specified.
- Lock Power Budget Power supply size for an access control door set: locks, readers and sensors, the worst-case simultaneous unlock, and the battery standby that follows.
- Voltage Drop What voltage actually arrives at the device on a 12 or 24 VDC run, checked against its minimum operating voltage.
- Battery Standby Amp-hour capacity required to hold a system up for the standby period, with derating for age and temperature.
Need it designed, installed or maintained?